C inspection of the GE-manufactured GT13 E2 gas turbine, replacement of turbine stator and rotor blades (from stages 1 to 5), replacement of burners, replacement of combustion chamber thermal barriers, tightening of compressor blades, replacement of VIGV blades, and commissioning.

LOCATION: Tekirdağ
YEAR: 2023
CAPACITY: 165 MW
VOLTAGE: 15,000 VOLT
SPEED: 3000 rpm