We carried out the revision and commissioning of the boilers, turbines, and auxiliary systems of all four units of the power plant, which was severely damaged in the 2023 earthquake.

LOCATION: Kahramanmaraş
YEAR: 2023
CAPACITY: 4×360 MVA
VOLTAGE: 15,000 VOLT
SPEED: 3000 rpm